123 Main Street Toronto, ON M5V 2H1 Canada +12262060914 test@example.com

basement

Project Information

  • Project Name : basement
  • Category : basement
  • Complete Date : 2 weeks

About project

🛠️ Basement Interior Work Stages
1. Wall Frame Installation
• Installation of wooden studs according to the layout.
• Securing the frame to the floor, ceiling, and walls.
• Checking vertical alignment and level accuracy.
2. Drywall Installation
• Covering the frame with drywall sheets.
• Cutting openings for outlets, switches, and ventilation.
• Fastening drywall with screws at regular intervals.
3. Plastering
• Sealing joints between drywall sheets.
• Applying base and finish coats of plaster.
• Sanding the surface until smooth.
4. Door Installation
• Mounting the door frame.
• Installing the door leaf, hinges, and handles.
• Adjusting gaps and ensuring proper operation.
5. Painting Walls and Doors
• Priming all surfaces.
• Applying paint in 2–3 coats.
• Using rollers, brushes, or a spray gun.
6. Baseboard Installation
• Measuring and cutting baseboards to fit the perimeter.
• Attaching them to the walls (with adhesive or screws).
• Sealing joints and painting if needed.

If you'd like, I can help you turn this into a checklist, a quote template, or even a project timeline.